Start free trial
SWMS Software

SWMS software built for the field, not the filing cabinet

The fastest way to draft, sign and store SWMS in Australia. Hazards and controls from your safety library, multi-party mobile signatures, and a full audit trail per job. Covers all 18 high-risk construction work categories.

How it works

From blank page to signed SWMS
in under 5 minutes

Build your SWMS step by step

A guided 5-step wizard walks you through creating a complete SWMS. Select your job, pick the tasks involved, and Burgy pulls in the relevant hazards automatically from your task library. Already have a SWMS from the head contractor or your consultant? Upload it as a PDF or photos and it sits against the job like any other.

  • 5-step guided creation wizard
  • Hazards auto-populated from your task library
  • Wet weather and vehicle hazards added automatically
  • Risk ratings calculated with a 5x5 matrix
  • Upload an existing SWMS (PDF or photos)
New SWMS
Step 3 of 5 - Manage Hazards
Working at heights > 2mMedium
Pre-control: High3 controls applied
Manual handling of formworkLow
Pre-control: Medium2 controls applied
Concrete splash / chemical contactLow
Pre-control: High4 controls applied

Hazards and controls filled in for you

Pick the tasks and Burgy pulls in each one's hazards, controls and PPE from your safety library. Add or remove anything before your crew signs, and save new hazards to the library for next time.

  • Hazards pulled in for each task you pick
  • Controls already attached to each hazard
  • PPE from the tasks on the job
  • Add your own to the library as you go
From your safety library
Task: Concrete Pour
Suggested Hazards
Slippery surfaces
Concrete burns from prolonged contact
Silica dust inhalation
Recommended PPE
Hard hatSafety glassesSteel-capped bootsGlovesHi-vis vest

Multi-party signatures on any device

Workers sign on their phone, supervisors approve on theirs. For extreme risk work, a safety officer gets a third approval step. All signatures are timestamped and stored.

  • On-screen signature drawing or saved signatures
  • Worker declaration + supervisor approval
  • Third sign-off for extreme risk activities
  • Timestamped and linked to user profiles
Sign Off
Concrete Pour SWMS - Step 5
Worker Declaration
Signed
JS
John Smith
Signed 7:02am
Supervisor Approval
Approved
MT
Mike Torres
Approved 7:10am
Safety Officer
Extreme Risk
Required for extreme risk activities

Export to PDF, always audit-ready

Generate a professional A4 landscape PDF with your company branding, full hazard tables, signature blocks, and HRCW checklist. Every change is tracked in the audit trail. Need to change an approved SWMS? Adjust it and Burgy makes a new linked version, keeping the original. Use an approved SWMS on another job instead of starting again.

  • A4 landscape PDF with company branding
  • Adjust an approved SWMS: new version, original kept
  • Use an approved SWMS on another job
  • HRCW checklist auto-populated from hazards
  • Full audit trail of every action
  • Approval, rejection, and ownership change tracking
Audit Trail
Concrete Pour SWMS
Document created
John Smith - 6:55am
Hazards reviewed and edited
John Smith - 7:00am
Submitted for approval
John Smith - 7:02am
Supervisor approved
Mike Torres - 7:10am
PDF exported
John Smith - 7:12am

Related

Just need a starting point?

Grab our free SWMS template for Australian construction: covers all 18 high-risk construction work categories, ready to fill in.

Start organising your company today.

Set up your company, add your crew and machines, and run your first prestart before smoko. If you'd rather see it first, we're happy to walk you through it.

14-day free trial. Set up your company in minutes.